Erstes Rohstoffblatt hat die vor ein paar Tagen ins Musterdepot.
Hab mir mal die Daten zum Unternehmen angeschaut,
scheint was dahinter zu stecken und Marketkap von aktuell 35Mio€
ist auch nicht übertrieben
www.castlegoldcorp.com/
|
Ich vermag die Qualität dieser Ergebnisse nicht zu deuten.
Permanent
February 11, 2009 Castle Gold Posts Technical Report on La Fortuna Metallurgical Test Program | |
December 2008 | |
You can view the Next Update item: Thu Nov 27, 2008, Conference Call - Q3 Financials You can return to the main Update page, or press the Back button on your browser. |
info@castlegoldcorp.com ZUR SOFORTIGEN VERÖFFENTLICHUNG: 2. April 2009 Nr. 07/09 CASTLE GOLD ERWEITERT BRECHANLAGE BEI DER GOLDMINE EL CASTILLO, WAS ZU EINER REDUKTION UM US$ 34 PRO UNZE AN INVESTITIONSKOSTEN FÜHRT, UND BEAUFTRAGT INVESTOR-RELATIONSUNTERNEHMEN CASTLE GOLD CORPORATION freut sich bekannt zu geben, dass es eine interne Studie bezüglich der Steigerung seiner Brechanlage bei der zu 100 % unternehmenseigenen Goldmine El Castillo im mexikanischen Bundesstaat Durango abgeschlossen hat. Die Investitionen belaufen sich auf insgesamt US$ 1,0 Millionen und beinhalten den Erwerb und die Installation eines tragbaren Sieb-Decks. Das neue Equipment soll die feinen Teile (weniger als ¾ Zoll) des hochgradigen Erzes heraussieben (zurzeit über 0,6 Gramm pro Tonne), sodass diese das bestehende Brech-Equipment umgehen und direkt auf den Haufenlaugungsplatten angehäuft werden können. Thomas Atkins, President und CEO von Castle Gold, sagte bezüglich dieser Investment- Möglichkeit: hervorragendes Beispiel für das gemeinsame Engagement unseres Betriebsteams bei El Castillo sowie unseres Technikerteams in Toronto. Diese relativ geringe Investition von insgesamt US$ 1,0 Millionen ermöglicht eine Ertragsrate von beeindruckenden 170 %, eine zehnmonatige Amortisationszeit und eine Verringerung der Betriebskosten um US$ 34 pro Unze. Diese Kosten kommen zu den bereits zuvor gemeldeten Einsparungen infolge der Benutzung von effizienterem und größerem Bergbau- Equipment hinzu. Unser Ziel ist es, die Siebanlage in Betrieb zu nehmen, um der gesteigerten Minenproduktion von 50.000 Unzen pro Jahr so nahe wie möglich zu kommen. Genaue Zeitpläne hinsichtlich Technik, Erwerb, Transport und Errichtung werden nun evaluiert, da wir den Zeitplan des Vertragspartners für die Mobilisierung von größerem und effizienterem Bergbau-Equipment kennen, um unsere erweiterten Produktionsziele zu erreichen.“ Die Möglichkeit, die Leistung der Sieb- und Brechanlage zu steigern, ergab sich aus den Beobachtungen, dass ein hoher Prozentsatz des hochgradigen Materials, das zurzeit zur Brechanlage geleitet wird, bereits in einer Größe vorhanden ist, die jedoch unterhalb jener für eine optimale Gewinnung liegt (weniger als ¾ Zoll). Die zurzeit verwendeten Sieb- und Brechbetriebe verfügen nicht über die ausreichende Kapazität, um diese Teilchengröße vor dem nachgeschalteten Brech-Equipment bei höheren Minenvolumen, die im erweiterten Produktionsszenario angestrebt werden, vollständig zu trennen. Die Investitionen in Höhe von US$ 1,0 Millionen für den Erwerb und die Installation des neuen Sieb-Equipments erfolgen zusätzlich zum groben Erz-Vorsieb, das bereits um US$ 263.000 gekauft und zum Standort gebracht wurde und die Technik sowie ein 20%-Kontingent beinhaltet. TSX-V Börsenkürzel: CSG Insgesamte Aktien im Umlauf: 75,3 Mio. Vollständig verwässert: 82,0 Mio. 52-Wochen-Kursbereich: C$ 0,15 - $ 0,63 80 Richmond Street West, Suite 1400 Toronto, ON, Canada M5H 2A4 Telefon: (416) 214-4809 Fax: (416) 214-4877 E-mail :
geplant, folgt doch heute noch eine Präsentation:
May 11, 2009 Castle Gold to attend New York Hard Assets Conference May 11/12. | |
Booth 608, Tom Atkins presenting at 9:32am Tuesday May 12 http://www.hardassetsny.com/Pages/default.aspx | |
You can return to the main Upcoming Events page, or press the Back button on your browser. |
22.05.2009 11:08:39
IRW-News: Castle Gold Corp.
IRW-PRESS: Castle Gold Corp.: CASTLE GOLD DURCHSCHNEIDET IM RAHMEN DES
BOHRPROGRAMMS ZUR RESSOURCENERWEITERUNG BEI DER MINE EL CASTILLO 109,7 METER MIT
EINEM GEHALT VON 0,7 GRAMM PRO TONNE GOLD
CASTLE GOLD DURCHSCHNEIDET IM RAHMEN DES BOHRPROGRAMMS ZUR RESSOURCENERWEITERUNG
BEI DER MINE EL CASTILLO 109,7 METER MIT EINEM GEHALT VON 0,7 GRAMM PRO TONNE
GOLD
CASTLE GOLD CORPORATION (Castle Gold, das Unternehmen) (TSX Venture Exchange:
CSG) freut sich, die ersten Untersuchungsergebnisse der ersten 8 von insgesamt
19 Bohrlöchern des Phase-I-Reverse-Circulation-Bohrprogramms zur Erweiterung der
Goldressource in Richtung Süden und Südosten des Tagebaus bei der zu 100 %
unternehmenseigenen Goldmine El Castillo im mexikanischen Bundesstaat Durango
bekannt zu geben.
Der beste Abschnitt dieses Programms wurde in Bohrloch CA - 216 gefunden: 109,7
Meter mit einem Gehalt von 0,70 Gramm pro Tonne Gold zwischen 16,8 und 126,5
Metern, einschließlich 65,5 Meter mit einem Gehalt von 1,02 Gramm pro Tonne Gold
zwischen 61,0 und 126,5 Metern. Alle bis auf eines der ersten acht Bohrlöcher
durchschnitten goldmineralisierte Abschnitte mit einer Länge von 7,6 bis 109,7
Metern und mit Goldgehalten über dem Cutoff-Gehalt der Ressource (0,15 Gramm pro
Tonne Gold), der für die Berechnung der Goldressourcen und -reserven der Mine El
Castillo verwendet wurde (siehe Tabelle 1: Zusammenfassung der
Untersuchungsergebnisse - Phase-I-Ressourcenerweiterungsbohrprogramm für die
Mine El Castillo). Diese sind mit den historischen Untersuchungsergebnissen in
Quelle:dpa-AFX
October 21, 2009 Castle Gold Q3-2009 Operating Performance - El Castillo Gold Production Increases 65 Percent Compared to Q3-2008 | |||||||||||||||||||||||||||||||||||||||||||||
News Release No. 19/09 CASTLE GOLD CORPORATION (Castle Gold, the Company) (TSX Venture Exchange: CSG) is pleased to provide an update on the ramp-up in mining and gold production at its 100 percent owned El Castillo Gold Mine in Durango State, Mexico. Operating highlights for the third quarter ended September 30, 2009 compared to Q3-2008 and Q2-2009, include:
Operating Performance - El Castillo Mine, Durango State, Mexico (100% interest) During the three month period ended September 30, 2009 mining rates at the El Castillo gold mine averaged 865,000 tonnes per month, more than double the rate of production from the year earlier period and almost 40 percent above rates achieved in Q2-2009 as mining operations benefited from the arrival of the remaining components of the new, larger and more efficient contractor supplied and operated equipment fleet. During the quarter a total of 2,594,800 tonnes of material was mined from the open pit of which 1,051,300 tonnes of ore, having an average grade of 0.42 grams per tonne gold was placed on the leach pad. Gold production during the quarter was 7,655 ounces.
During the third quarter the balance of the new equipment arrived on site. This now includes:
El Castillo - Additional Expansion Potential At present, limits to capacity throughout exist as a result of planning (pad design, timing of new pad location infrastructure), permitting and additional contractor equipment to accommodate volumes in excess of 1,000,000 tonnes per month (no -- additional CAMSA equipment is also required). The Company is confident of its ability to increase resources and reserves in the area to the south of the currently designed open pit at Castillo as evidenced by results from its Phase I resource expansion drilling program (refer to press releases dated May 21 and June 9, 2009). The Company is near completing the re-calculation of gold resources at El Castillo as a result of Phase I drilling and taking into account geological controls for populations of Run-of-Mine grade and High-Grade gold material. Result from this work will be used to plan a Phase II drill program which, if successful in adding additional gold reserves, such reserve additions have the potential to facilitate a further ramp-up of production capacity to in excess of 70,000 ounces per year of annual gold production. Planning and permitting applications are in process to facilitate these higher rates of production and all work and permits are expected to be completed by Q2-2010. Additional mining equipment to achieve increased production levels is believed to exist within an approximate three month lead time. Once planning, permitting and the a new, expanded reserve approaches completion, such equipment can be ordered to achieve the production objectives. The timing of the commencement of the Phase II drill program is yet to be defined. However, Phase II drilling is conditionally approved by the Board of Directors, pending review of the results of the new resource calculation and the details on number, location and cost of drilling to potentially further expand resources in the target area and to bring such resources into the Proven and Probable reserve categories. El Castillo -- Screening Plant The Board of Directors, on September 24, 2009, formally approved an approximate US$1.3 million total investment in the engineering, purchase and construction of a portable screening plant to screen out the fine fraction (material less than ¾ inch) of the high-grade ore that would otherwise pass through the contractor operated screen-crusher plant prior to being stacked on the heap leach pads (refer to press release dated April 2, 2009). The opportunity to enhance the performance of the screen-crush plant arose from observations that a large percentage of the high-grade material that is currently being crushed, given the manner in which this material fractures on blasting, breaks to a size fraction below the targeted size for optimal recoveries of gold of such high-grade material -- less than ¾ inch in size. The current contracted screen-crusher plant equipment configuration does not permit the screening of this fine fraction of high-grade material thereby reducing the capacity of the existing crushing operations, resulting in reduced recoveries of gold. The installation of this screen deck will enable the portion of blasted, fine, high-grade material to simply be screened-out from the coarser high-grade material allowing the crushing circuit capacity to be significantly increased. In the April 2009 release it was determined that on the basis of savings in crushing costs relative to the current contractor terms, higher volumes of production and recovery of additional ounces of gold relative to the capacity of the current contractor equipment, per unit operating costs are expected to be reduced by approximately 50 percent for savings of US$34 per ounce of gold produced. The internal rate of return on the investment of US$1.0 million is calculated at 172 percent with a quick approximate 10 month return on invested capital. Assuming the US$34 per ounce operating cost savings, enhanced gold recoveries and a US$800 per ounce gold price, annual cost savings are estimated at US$1.7 million. Based on the current mine life of 10 years at in excess of 50,000 ounces of gold per annum and assuming a life-of-mine average gold price of US$750 per ounce and a 5% discount rate this US$1.0 million investment produces a net present value of US$10 million based on current reserves. The screening plant is expected to be operational in Q1-2010 coincident with higher volumes of ore being mined as the amount of waste to be mined declines (waste to ore ratio declines) under the current mining plan. About Castle Gold Castle Gold Corporation is a growth oriented gold producer with projects focused in the America's. The Company owns a 100% interest in the El Castillo gold mine in Mexico and a 50% interest in the El Sastre gold mine in Guatemala. Castle Gold is also advancing exploration and development work at its La Fortuna gold-silver-copper project in Mexico and at its El Sastre and El Arenal project in Guatemala. For further information please contact:
or by fax: 416 366-7421, email: info@castlegoldcorp.com or visit our website: www.castlegoldcorp.com. |
Argonaut Gold Seeks to Acquire Castle Gold for a Minimum of C$1.25 Per Share
TORONTO, ONTARIO, Oct 28, 2009 (MARKETWIRE via COMTEX) -- CASTLE GOLD CORPORATION (CSG) is pleased to announce today that it has entered into a support agreement with Argonaut Gold Inc. ("Argonaut") in connection with the proposed acquisition (the "Offer") by Argonaut of all of the common shares of Castle Gold Corporation ("Castle Gold"). Under the terms of the Support Agreement, Argonaut will offer to acquire, by way of a take-over bid, all of the issued and outstanding Common Shares at a price of C$1.25 per fully diluted share, subject to an increase in such price by C$0.01 for every 1% increase in the price of gold calculated from a starting gold price of US$1,050 to the 5 day average London Gold Fix (PM) price for December 18, 21, 22, 23 and 24, 2009, provided that the maximum final Offer price shall not exceed C$1.50 per Common Share.
Preis auf Eurobasis liegt bei 0,78€
http://cxa.marketwatch.com/TSX/en/Market/...38138B428%7d&symb=CSG
Wertung | Antworten | Thema | Verfasser | letzter Verfasser | letzter Beitrag | |
11 | Castle Gold WKN: A0M0Z3 ISIN: CA14844L1040 | TraderA | permanent | 28.10.09 14:41 |